Eurovia

News
EUROVIA starts building a motorway near Žilina

National Motorway Company and joint venture of EUROVIA SK, Stavby Mostov Slovakia and Hochietf CZ singed the contract on May 26th 2014 which launched the construction of 4,25 km section on D3 highway between Žilina (Strážov) and Žilina (Brodno). The ceremonial laying of the cornerstone with participants from goverenment, contractor companies and clients was held on June 17th 2014 on Hlinka Square in Žilina.


Ceremonial knocking on the cornerstone in Michalovce
The construction named "I/50 and 1/18 Michalovce crossroad" officially started on November 5, 2013. At this ocasion, in the presence of V.Stromček, the State secretary of Ministry of Transport Construction and Regional Development, Z.Trebuľa, the president of the Košice Self-governing Region, V. Záhorčák, the Mayor of Michalovce,  R.Žembera, CEO of the Slovak Road Administration, the supreme representatives of EUROVIA SK and other giests, the cornerstone of the construction was knocked. The rebuilding of the actual road junction to a roundabout is realised as a part of crossroads reconstruction on the roads of 1st class by means of the Operational Programme Transport. The works should take 13 months, cost € 1,89 mil. and will be executed by Michalovce sector.
1st stage of works for Bratislava public transport system has been launched
EUROVIA SK, SA in a joint venture with EUROVIA CS, SA and SMP CZ, SA signed on Tuesday 22nd October 2013 a work contract with the capital city of Slovakia - Bratislava.
Building a tramway track over the Danube river is the first part of the project. The most important and most challenging construction consists of a reconstruction of the Old Bridge over the Danube with a length of 465 meters. Its old structure will be replaced by a new one with a final width of 135 meters permitting the ships sailing between pylons.The total length of the whole construction represents 2.4 km and the total length of roads 1,7 km.The project includes 3 bridges and 1 footbridge. Construction companies led by EUROVIA SK, SA have declared to finish works within 22 months from the date of signing the contract which is valued at € 58.8 million and co-financed by funding from UE.
 

 

all news

Eurovia

Career

The company EUROVIA SK has now a stabilized its team of employees. This does not mean that sometimes we do not need to supplement the team by people with experience or rejuvenate it by high school and university graduates. In such cases, working collectively increases the current needs in the regions covered by the company.
 
If you are interested in work in blue-collar occupations (laborers, drivers, machinists), please contact directly the selected organizational unit (Contact section). Recruitment for this kind of position is fully the responsibility of the individual plant.
 
If you are interested in technical, administrative and managerial positions, contact the Section Humans resourses in Kosice at martin.kuzma@eurovia.sk.